LIST OF COMPLETED CONSTRUCTION PROJECTS

Company "Activ" Ltd, registered by Decision № 1120 on 24 March 1995 and as a direct successor of the Sole Trader "Activ", which has performed construction work since 1991. From then on we have completed and submitted to the State Commission a number of sites in part Architecture & Construction, Water & sewage, Electrical, HVAC, Water supply of settlements and Building of Infrastructures, as the main ones are:

  • Block of Flats No. 2, town of Pomorie – 30 apartments (finishing works)
  • Block of Flats No. 17, town of Malko Tarnovo – 24 apartments (finishing works)
  • Block of Flats No. 9, town of Burgas , Vazrazhdane Complex – 60 apartments (finishing works)
  • One-family house in Sarafovo Quarter (finishing works)
  • Refurbishment of buildings of Bulgarplod
  • Housing Association "Hydrostroitel", town of Burgas – 60 apartments
  • Housing Association "Veno" – town of Burgas (finishing works)
  • House-museum "Petya Dubarova", town of Burgas – reconstruction
  • House for temporary accommodation of socially disadvantaged children – town of Burgas – reconstruction
  • Repairs and construction works at "Neftochim" EAD, town of Burgas
  • Canalization of Pobeda Quarter, town of Burgas – stage I
  • Reconstruction of kindergarten into museum and art gallery, town of Pomorie – reconstruction
  • Transport Hospital , Burgas – reconstruction and painting works
  • Chemical laboratory at "Petrol" PLC – reconstruction
  • Water supply – village of Iglika
  • "List" Hotel – town of Sozopol – structures
  • "Production and Technical Facility for Post Office and Telephone Exchange" – town of Ahtopol
  • Housing Association "Rakovska" – town of Burgas
  • Repair works at Culture House – village of Ravda and others
  • General repair, reconstruction and refurbishment of the building of General Administration "Customs" – town of Nessebar
  • Production facilities in the town of Bulgarovo, built-up useful floor area - 3500 sq.m.
  • Educational and rehabilitation facilities of the University of National and World Economy – Sofia in the village of Ravda , built-up area - 5500 sq.m.
  • Residential building in the town of Primorsko with built-up floor area – 1200 sq.m.
  • Hotel-type building in the town of Primorsko with built-up floor area – 2000 sq.m.
  • Outdoor swimming-pool on the terrain of "Neo Kiten" Complex, village of Kiten of 530 cub.m. volume and others
  • Residential building of Karnobat Municipality – town of Karnobat with built-up floor area - 1600 sq.m.
  • Residential building on RLE I, quarter 95 in the town of Nessebar, built-up floor area – 2700 sq.m.
  • Hotel complex in plot I, quarter 221 in the town of Pomorie – external water & sewerage connections – stage II
  • Hotel complex in plot I, quarter 221 in the town of Pomorie – buildings "F" and "G"

At present , the sites under construction performed by the company are :

  • Hotel complex in plot I, quarter 221 in the town of Pomorie – Buldings "3", "4", "5", "6"
  • Hotel complex in plot I, quarter 220 in the town of Pomorie – 17000 sq.m.
  • Hotel of SD "Migo" in RLE II-556, quarter 1302 in "Sunny Beach west" Resort Complex – 6000 sq.m.
  • Hotel in the town of Sozopol – 1200 sq.m.
  • Housing Association on 85, Probuda Str. – 1600 sq.m.
  • Housing Association on 78, Patriarch Evtimiy Str. – 1000 sq.m.
  • Housing Association on 74, Patriarch Evtimiy Str. – 1200 sq.m.
  • Housing Association in Sarafovo Quarter – 2300 sq.m.
  • Housing Association in the town of Tsarevo – 3600 sq.m.

The company is well-known in the municipalities Burgas, Pomorie, Karnobat, Primorsko and Tsarevo; University of National and World Economy – Sofia, "Bulgarian Post" EAD. We may offer, if requested, additional recommendations for projects completed by our company from private and other investors. The company is a regular member of the Bulgarian Chamber of Construction since 1997.

    • Откриване спортна площадка ПГЕЕ"Константин Фотинов"
    • Architect:
       
    • Investor:
       
    • Date of completion:
       
    • Information [+] Gallery
    • Сграда в Царево в близост до Черно море
    • Architect:
       
    • Investor:
       
    • Date of completion:
       
    • Information [+] Gallery
    • Нова сграда към ЦДГ №3, в УПИ I, кв.12 по плана на кв.”Крайморие”, гр.Бургас
    • Architect:
       
    • Investor:
       
    • Date of completion:
       
    • Information [+] Gallery
    • Апартхотел „ГАЛЕРА БИЙЧ”, м.”Кротиря”, гр. Поморие
    • Architect:
       
    • Investor:
       
    • Date of completion:
       
    • Information [+] Gallery

Page : [1] 2 3 4 5